BHUBANESWAR | 26 October 2026: Tata Power has announced an initial capital investment of ₹54.31 crore to establish a dedicated Global Capability Centre (GCC) in Khordha district, Odisha. Slated to reach full operational readiness within the next three months, the facility carries historic significance as the first GCC formally approved under the Odisha government’s dedicated GCC policy.
Rather than functioning as a routine customer call center or basic billing outpost, the Khordha hub is engineered as a deep-tech energy analytics engine. The deployment is structured to house 110 specialized professionals tasked with developing algorithmic and simulation-based solutions to govern modern power grids, renewable generation assets, and large-scale utility infrastructure.
KEY HIGHLIGHTS
- The ₹54.31 Crore Capital Allocation: Cleared by the Odisha government in September 2026 alongside 18 other industrial proposals, the investment is directly earmarked for high-performance IT infrastructure, enterprise software licensing, physical workspace commissioning, and specialized technical manpower.
- High-Density Talent Composition: The initial cohort of 110 high-skill roles bypasses administrative staffing in favor of multidisciplinary engineering. The hiring mandate specifically targets AI specialists, data scientists, cloud infrastructure engineers, digital platform architects, and power-sector domain experts.
- Dual Internal & Commercial Mandate: Breaking from the traditional captive model that only serves internal corporate workflows, the Odisha GCC is mandated to build commercializable digital products and services for external utility customers positioning the centre as a standalone revenue generator.
- First-Mover Policy Execution: The project serves as the flagship anchor for Odisha’s dedicated GCC Policy, which targets over ₹1,000 crore in institutional investment and 50,000 direct and indirect jobs across seven designated regional clusters, including Bhubaneswar, Cuttack, Puri, Paradip, and Sambalpur.
Headquartered in Mumbai, Tata Power Company Limited is an integrated power utility, commanding a diversified portfolio across 12.4 GW of renewable energy, 8,752 MW of conventional generation, and 7,403 circuit kilometers of transmission lines. Serving a 13-million customer base alongside a rapidly scaling network of 5,600+ EV charging stations, the company holds a dominant operational footprint in eastern India operating all four power distribution utilities (DISCOMs) across Odisha (TPNODL, TPSODL, TPWODL, and TPCODL).
INSIDE THE HUB: ENGINEERING THE ALGORITHMIC GRID
Managing the intermittency of renewable energy alongside legacy thermal and hydro grids requires real-time computational modeling. The Khordha GCC is mandated to execute complex operational technology (OT) and information technology (IT) integrations:
- Agentic AI & Predictive Grid Management: The engineering squads will deploy machine learning, generative AI, and agentic AI to automate asset health monitoring, load demand forecasting, and capital investment planning. By predicting transformer failures and consumption spikes before they occur, the algorithms directly reduce transmission losses.
- Digital Twins & Blockchain Architecture: Beyond core AI, the facility is tasked with building 3D digital twins, simulation systems, knowledge graphs, and blockchain ledgers. These tools will simulate both the construction phases and live operational mechanics of solar manufacturing plants, pumped-hydro storage projects, and smart distribution grids.

Ask an Expert
